MOSE PROJECT

REFERENCES

S.I.C.E.S. S.R.L.

“That‘s because MOSE is currently the most massive public works project in the entire world.”

An Innovative system of 78 pneumatically operated gates installed at the 3 inlets connecting the Venice Lagoon and the Adriatic Sea and able to temporarily isolate the Venetian Lagoon from the Sea during high tides.
Image

More informations:

  • Location: Venice, Italy
  • End User: Consorzio Venezia Nuova
  • Sector: Civil Engineering
  • Target: Save the Venice from devastating floods
    An Innovative system of 78 pneumatically operated gates installed at the 3 inlets connecting the Venice Lagoon and the Adriatic Sea and able to temporarily isolate the Venetian Lagoon from the Sea during high tides.

Solution

SICES designed, manufactured and tested a customized control system using Sices DST4602 and D-monitor for the twelve gen-sets used to power the massive compressors needed to raise the gates.

© 2023 S.I.C.E.S. Società Italiana Costruzioni Elettriche Sumirago S.R.L.
Via Molinello n. 8/B 21040 - JERAGO CON ORAGO (VA) | Tel. +39 0331212941 | Fax +39 0331216102
Codice Fiscale, Partita IVA e N. Iscrizione al Registro Imprese CCIAA di Varese 00587340126 R.E.A. CCIAA di Varese 142977 VAT Number IT00587340126 Capitale Sociale € 500.000 i.v.

Design & programming Graphic studio VLADO
Cookie Policy | Privacy Policy | DURC | Politica SGI | IMS Policy