Sices has designed 10 gas-powered generator control panels for the production power plant, 1 control panel for a 560 kW diesel-powered emergency generator for the same plant, as well as 1 common control panel and 1 distribution panel. The power plant provides additional electrical power that allows for the expansion of the gas production facility to increase the quantity of gas produced from this important deposit.
Location: Western Egypt Sector: Oil & Gas Target: Supply control panels to ensure increased gas production at the oil field. End Client: Eni
Projects Completed.
Automation
Macchi SPA
Oil & Gas
Ag Refrigerator
Food and Beverage
Turboden
Power Generation
Terna
Oil & Gas
ENI - Zhor
Power Generation
Emil Resort PVT Ltd.
bio Gas
MTM
Data Center
Data Center
Oil & Gas
Tap
CONTACT US
Do you want more information?
Contact Us.
Tell us about your idea and your needs, and we will leverage our expertise to provide you with a tailored solution that fits your project best.