Seychelles international airport was built in 1971 and significantly expanded in 1980 and again in 2006. Its standby power plant equipment was installed during these various phases.

SCAA

More informations:

  • Location: Seychelles, Island of Mahé
  • End User: Ineo Suez /Seychelles international airport
  • Sector: transport
  • Target: upgrade the Gen-Set controls 

Solution

SICES entered a project to upgrade the controls on 3× 315 kVA standby gen-sets to operate in conjunction with the additional 2× 810 kVA standby sets. A total of 3× DST4602 Evolution were used for the generator control with 3× DST4602 Remote displays and 15” D monitor touch screen in the remote monitoring location. 2× ATS115 controllers controlled the changeover switches in the event of mains failure.

© 2019 S.I.C.E.S. Società Italiana Costruzioni Elettriche Sumirago S.R.L.
Via Molinello n. 8/B 21040 - JERAGO CON ORAGO (VA) | Tel. +39 0331212941 | Fax +39 0331216102
Codice Fiscale, Partita IVA e N. Iscrizione al Registro Imprese CCIAA di Varese 00587340126 R.E.A. CCIAA di Varese 142977 VAT Number IT00587340126 Capitale Sociale € 500.000 i.v.

Design & programming Graphic studio VLADO
Cookie Policy | Privacy Policy