SOUTH PARS PLATFORM

Gas field

REFERENCES

S.I.C.E.S. S.R.L.

"SOUTH PARS PLATFORM SPD20 – SPD21"

South Pars phases 20 & 21 was a significant mega gas project in which OIEC Group gained unparalleled experience and capabilities through designing, construction and managing such project in onshore and offshore, upstream and downstream.

The whole project is design to 2 bscfd reservoir fluids by drilling 24 wells, installing 2 unmanned wellhead platforms and transferring the fluids to onshore refinery by two 32” subsea pipelines.

SICES for Pars Oil

More informations:

  • Location: Iran, IOEC Khoramshahr Fabrication Yards - Yard No. 3
  • End user: Pars Oil and Gas company
  • Sector: Oil&Gas
  • Target: Keep the Gas flowing from the world’s biggest gas field.

Solution

SICES entered the project and designed 2  Gen-set control panel, housed in Ex’d Classed Explosion proof panels for managing of 2 gen-sets rated at 380kVA – for each platform. In addition a remote control panel for each set was installed in the platform control room.



SICES provides:
DST4602 Evolution for each gen-set
DST4602 Remote for each gen-set
D-PRO For each gen-set
Battery charger and additional I/O modules 

© 2019 S.I.C.E.S. Società Italiana Costruzioni Elettriche Sumirago S.R.L.
Via Molinello n. 8/B 21040 - JERAGO CON ORAGO (VA) | Tel. +39 0331212941 | Fax +39 0331216102
Codice Fiscale, Partita IVA e N. Iscrizione al Registro Imprese CCIAA di Varese 00587340126 R.E.A. CCIAA di Varese 142977 VAT Number IT00587340126 Capitale Sociale € 500.000 i.v.

Design & programming Graphic studio VLADO
Cookie Policy | Privacy Policy